facebook wequips white  twitter wequips  linkedin weqquips white  youtube wequips   googleplus wequips  flickr wequips 

Offshore Leads

Brand: ICE

The offshore lead is hung from the crane boom by a crane line. The bottom of the leads has a guide that slides over the top of the pile. The crane line and boom are positioned to keep the leads plumb or at the desired batter in line with the pile.

An offshore lead is generally used with larger piles and hammers. The pile must have its own support structure.

An offshore lead is assembled from three components: a leads section, lifting gear and a pile guide. The leads section will guide the pile hammer and drive cap. The lifting gear supports the leads section and provides spacing for the ram and has a starting line if a diesel hammer has been used. The pile guide will align the leads, hammer and drive cap with the pile.

• 26 inches

• 32 inches

• 36 inches

• 42 inches

• 48 inches

• 60 inches

• 66 inches


phone wequips +507 321-1275 cell wequips+507 6672-1761 email wequips This email address is being protected from spambots. You need JavaScript enabled to view it.  skype wequips wequips 

© 2017 Wequips. All Rights Reserved.

facebook wequips white  twitter wequips  linkedin weqquips white  youtube wequips   googleplus wequips  flickr wequips